Our Septic System Inspection

 

⧫   We locate the tank and leaching area.

⧫   We determine the condition and material of the tank and baffles.

⧫   We look at the inlet and outlet pipes for signs of settlement or damage.

⧫   We dig 1 – 3 test pits in the leaching area (depending on system and ground conditions).

⧫   We determine system conditions using the evaluation guidelines of the Certified Septic Evaluators Program developed by the Granite State Designers and Installers association.

⧫   We run water into tank to determine that the system is functioning properly.

⧫   We produce a written report within 24 - 48 hours of the inspection.